Monday, June 29, 2009

The wall. Hell yeah. It's all coming together now. The tiles are 18's which is way too huge! Its looking like a spa now!




Wednesday, June 24, 2009

Tile - floor

Before



After



After After Cleaning



Friday, June 12, 2009

trimwork and prime

Since I have some time before appraisal, I decided to add some trim to the bathroom.
Before








After










Time to prime!





The room looks a whole lot bigger! I will decide on a color in the near future. I will let Trey paint the ceiling along with the trim this weekend. For now, I am going back under the house to install the plumbing and route things correctly. I'm still working on a design pattern for the floor.

Wednesday, June 3, 2009

The bathroom is coming along nicely. We're almost ready for tiling. There's a few things needed to be done before tiling:

1) run wires from basement to 2nd/3rd floor for alarm, extra power, ethernet
2) connect new plumbing to existing and test for leaks
3) drill hole for toilet

So here's where we are now:













You see this wiring hole? I was lucky on the first shot to drill right through it! The first time, I used a small bit and was like "i think i hit the plastic." Then took the hole saw and was like "what the hell, it won't hurt it." Drilled a perfect hole although I had knocked the container loose. I took a framing nail and pounded the sucker in. We're all set.

The vanity lights



The dining room all messed up again.

NEVER PUT DRYWALL UP BY YOURSELF. YOU WILL DIE FROM MULTIPLE CONCUSSIONS.